• İstanbul Metro 4. Levent - Ayazağa Section

    İstanbul/ Turkey

    The project consists of the engineering, procurement and construction of 4,725 m long metro system extension between 4. Levent and Ayazagˆa with 3 stations including the depot area.

    The main works items of the project are as follows:

    - Construction of Sanayi and Ayazagˆa stations,

    - Conventional deep bored tunnel construction (NATM) 14,344 m, - Cut and cover tunnel construction 100 m,

    - Viaduct construction 55 m,

    - 68,000 m2 depot area.