Projects
-
Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
Romania/Bucharest
The Southern Bucharest Ring Road Project, which we have undertaken in Romania, is 33 km long and consists of two sections. It is foreseen to be completed in a total of 36 months, including 12 months of design and 24 months of construction. The Ring Road project, which will constitute one of the busiest traffic arteries of Romania, includes the junctions of the national roads Bucharest - Giurgiu and Bucharest - Alexandria - Craiova. The design phase of the project to be realized with the EPC model has been completed and the construction works are expected to be completed by 2023. Within the scope of the project planned as 2x2, 10 highway viaducts, 19 overpass bridges, 4 highway intersection arrangements, bituminous hot coating works, 55 culverts, 2 operation and maintenance areas, 4 temporary parking areas, highway traffic regulation and passenger information systems (ITS) and other closed security systems, road lighting and various finishing works will be done.
Client
National Road Administration Company SA
Completion Date
31.07.2024
Capacity
N/A
-
No. Subject of the Tender / Obiectul Licitatiei Announce Date / Data Anunt Final Application Date / Termen Limita de Depunere a Cererii Status / Stare Link LOT 2 - 2021-300-02-01A Temporary lighting works – Daraşti / Lucrări provizorii de iluminat – Daraşti 5/20/2021 6/20/2021 CLOSED/ÎNCHIS 2021 300 02 01A LOT 2 - 2022-300-02 Diversion works of the OMV Petrom Water Lines / Lucrărilor de deviere OMV PETROM 1/2/2023 1/27/2023 CLOSED / ÎNCHIS 2022 300 01 OMV LOT 2 - 2022-300-02-01B Lighting works – Daraşti / Lucrări de iluminat – Daraşti 6/1/2022 6/30/2022 CLOSED/ÎNCHIS 2022 300 02 01B DARASTI LIGHTING LOT 2 - 2023-300-09012023 Roller Guardrail Works/ Lucrări Parapet cu role 1/9/2023 1/30/2023 CLOSED/ÎNCHIS 2023 300 01 09012023 ROLLER GUARDRAILS R01 LOT 2 - 2023-300-01112023-02 Power Supply Works / Lucrări De Alimentare Electrică 11/1/2023 11/30/2023 CLOSED/ÎNCHIS 2023 300 02 01 Bpower Supply Works LOT 2 - 2023-300-15112020-03 Modification of power supply source for ITS/ Modificare sursa alimentare ITS 11/15/2023 11/27/2023 CLOSED/ ÎNCHIS 2023 300 15112020 03 INVITATION TO TENDER ITS LOT 2 - 2024-300-19012023-01 Anti-Vandalism Panel / Panouri Antivandalism 12/1/2023 1/31/2024 CLOSED/ÎNCHIS 2024 300 02 Anti Glare Panels LOT 1 - 2020-301-01 Expropriation works/Lucrări de expropriere 5/2/2020 6/30/2020 CLOSED/ÎNCHIS 2020 301 01 EXPROPRIATION R01 LOT 1 - 2020-301-02 Relocation of the Potable Water, Sewage and Irrigation Networks/ Relocare rețele de apă potabilă, canalizare și irigații 10/1/2020 3/15/2021 CLOSED/ ÎNCHIS 2020 301 02 WATER SEWAGE IRRIGATION LOT 1 - 2020-301-03 Relocation of Telecommunication Network Works/Lucrări de relocare rețele telecomunicații 11/1/2020 12/1/2020 CLOSED/ÎNCHIS 2020 301 03 TELEKOM LOT 1 - 2020-301-04 Relocation of the Natural Gas/Oil Networks/Relocare rețele gaze naturale/petrol 11/1/2020 1/15/2021 CLOSED/ÎNCHIS 2020 301 04 GAS OIL LOT 1 - 2021-301-01 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz 4/18/2021 5/6/2021 CLOSED/ÎNCHIS 2021 301 01 TRANSGAZ LOT 1 - 2021-301-02 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz (Km 56+380) 8/18/2021 9/15/2021 CLOSED/ÎNCHIS 2021 301 02 TRANSGAZ LOT 1 - 2022-301-01 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz (3 lines) 9/1/2022 9/26/2021 CLOSED/ÎNCHIS 2022 301 01 TRANSGAZ LOT 1 - 2024-301-06082024-01 Culvert over the ANIF canal in the continuation of the Popesti Leordeni ramp of the overpass on the DE over the motorway km 65+151/ Podet peste canalul ANIF in continuarea rampei Popesti Leordeni a Pasajului de pe DE peste Autostrada km 65+151 8/6/2024 8/16/2024 CLOSED/ ÎNCHIS 2024 301 06082024 01 INVITATION TO TENDER ANIF CULVERT LOT 1 - 2024-301-21052024-02 Signalization of A0/A2 Interchange / Semnalizarea nodului rutier de la intesectia Autostrazii A0 cu A2 5/21/2024 6/3/2024 CLOSED / ÎNCHIS 2024 301 21052024 02 INVITATION TO TENDER PORTALS LOT 1 - 2024-301-26052024-03 Installation of Sound absorbing Panels on A0, Interchange A0/A2, link G/ Instalare Panouri fotoabsorbante pe Autostrada A0, nod rutiere A0 / A2, bretea G 5/26/2024 6/10/2024 CLOSED / ÎNCHIS 2024 301 26052024 03 INVITATION TO TENDER SOUND ABSORBING PANELS LOT 1 - 2024-301-18112024-04 Additional works for Berceni / Lucrari suplimentare Berceni 11/18/2024 11/29/2024 CLOSED / ÎNCHIS 2024 301 18112024 04 INVITATION TO BERCENI ADDITIONAL WORKS 2024-301-10102024-05 Additional works for A2 culvert at km 1+662 / Lucrări suplimentare pentru podet A2, km 1+662 10/10/2024 10/30/2024 CLOSED / ÎNCHIS 2024 301 10102024 05 INVITATION TO Additional Works For A2 Culvert At Km 1+662 LOT 1 2024-301-01072024-06 A2 Storm Damage Repairs A2 Storm Damage Repairs / Reparații pentru Daune Cauzate de Furtună - A2 7/1/2024 7/10/2024 CLOSED / ÎNCHIS INVITATION TO Storm Damage Repairs LOT 1 - 2024-301-01102024-07 Berceni Overpass Lighting System / Sistemul de iluminat al pasajului Berceni 10/1/2024 10/15/2024 CLOSED / ÎNCHIS 2024 301 01102024 07 INVITATION TO Berceni Overpass Lightning System Rev -
Branch Offices
-
Alarko
Strada Mircea Vulcănescu 49, București, Romanya
- Telephone: +40 31 438 04 43
- Fax: +40 31 438 04 43
- Email: info@alsim.alarko.com.tr
- Website: https://alsimalarko.com.tr
-
Alarko
Strada Mircea Vulcănescu 49, București, Romanya
- Telephone: +40 31 438 04 43
- Fax: +40 31 438 04 43
- Email: info@alsim.alarko.com.tr
- Website: https://alsimalarko.com.tr
-