Head Office
    EN
    • TR
  • Contracting Contracting
  • About Us
    • Alarko Contracting Group
    • History
    • Vision, Mission and Values
    • Board Of Directors
    • Organization Chart
    • GDPR
    • Awards
    • Promotional Catalog and Film
    • Certificates and Policies
  • Activity Fields
  • Career and Life
    • Life at Alarko
    • Career Oppurtinities
  • News
  • Sustainability
    • Sustainability
    • Our Sustainability Approach
    • Planet
      • Climate Change
      • Ecosystem Restoration
    • People and Culture
      • Talent Management
      • Organizational Development
      • Investments in Community
    • Digital Transformation and Innovation
      • Digital Transformation
      • Novel Products and Innovation
    • Sustainability Reports
Projects
Search
  • ALARKO Logo English
  • EN
    • TR
  • About Us
    • Alarko Contracting Group
    • History
    • Vision, Mission and Values
    • Board Of Directors
    • Organization Chart
    • GDPR
    • Awards
    • Promotional Catalog and Film
    • Certificates and Policies
  • Activity Fields
  • Career and Life
    • Life at Alarko
    • Career Oppurtinities
  • News
  • Sustainability
    • Sustainability
    • Our Sustainability Approach
    • Planet
      • Climate Change
      • Ecosystem Restoration
    • People and Culture
      • Talent Management
      • Organizational Development
      • Investments in Community
    • Digital Transformation and Innovation
      • Digital Transformation
      • Novel Products and Innovation
    • Sustainability Reports
Projects
  • Name

Projects

  • Homepage
  • Projects
  • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
Back
  • Project Details
  • Tender
  • Contact
  • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest

    Romania/Bucharest

    The Southern Bucharest Ring Road Project, which we have undertaken in Romania, is 33 km long and consists of two sections. It is foreseen to be completed in a total of 36 months, including 12 months of design and 24 months of construction. The Ring Road project, which will constitute one of the busiest traffic arteries of Romania, includes the junctions of the national roads Bucharest - Giurgiu and Bucharest - Alexandria - Craiova. The design phase of the project to be realized with the EPC model has been completed and the construction works are expected to be completed by 2023. Within the scope of the project planned as 2x2, 10 highway viaducts, 19 overpass bridges, 4 highway intersection arrangements, bituminous hot coating works, 55 culverts, 2 operation and maintenance areas, 4 temporary parking areas, highway traffic regulation and passenger information systems (ITS) and other closed security systems, road lighting and various finishing works will be done.

    Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest />
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    • Design and Execution of Lot 1 and Lot 2 South Ring Motorway Bucharest
    Client

    Client

    National Road Administration Company SA

    Completion Date

    Completion Date

    31.07.2024

    Capacity

    Capacity

    N/A

  • No. Subject of the Tender / Obiectul Licitatiei Announce Date / Data Anunt Final Application Date / Termen Limita de Depunere a Cererii Status / Stare Link
    LOT 2 - 2021-300-02-01A Temporary lighting works – Daraşti /  Lucrări provizorii de iluminat – Daraşti 5/20/2021 6/20/2021 CLOSED/ÎNCHIS 2021 300 02 01A
    LOT 2 - 2022-300-02 Diversion works of the OMV Petrom Water Lines / Lucrărilor de deviere OMV PETROM  1/2/2023 1/27/2023 CLOSED / ÎNCHIS 2022 300 01 OMV
    LOT 2 - 2022-300-02-01B Lighting works – Daraşti / Lucrări de iluminat – Daraşti 6/1/2022 6/30/2022 CLOSED/ÎNCHIS 2022 300 02 01B DARASTI LIGHTING
    LOT 2 - 2023-300-09012023 Roller Guardrail Works/ Lucrări Parapet cu role 1/9/2023 1/30/2023 CLOSED/ÎNCHIS 2023 300 01 09012023 ROLLER GUARDRAILS R01
    LOT 2 - 2023-300-01112023-02 Power Supply Works / Lucrări De Alimentare Electrică 11/1/2023 11/30/2023 CLOSED/ÎNCHIS 2023 300 02 01 Bpower Supply Works
    LOT 2 - 2023-300-15112020-03 Modification of power supply source for ITS/ Modificare sursa alimentare ITS 11/15/2023 11/27/2023 CLOSED/ ÎNCHIS 2023 300 15112020 03 INVITATION TO TENDER ITS
    LOT 2 - 2024-300-19012023-01 Anti-Vandalism Panel / Panouri Antivandalism 12/1/2023 1/31/2024 CLOSED/ÎNCHIS 2024 300 02 Anti Glare Panels
    LOT 1 - 2020-301-01 Expropriation works/Lucrări de expropriere 5/2/2020 6/30/2020 CLOSED/ÎNCHIS 2020 301 01 EXPROPRIATION R01
    LOT 1 - 2020-301-02 Relocation of the Potable Water, Sewage and Irrigation Networks/ Relocare rețele de apă potabilă, canalizare și irigații 10/1/2020 3/15/2021 CLOSED/ ÎNCHIS 2020 301 02 WATER SEWAGE IRRIGATION
    LOT 1 - 2020-301-03 Relocation of Telecommunication Network Works/Lucrări de relocare rețele telecomunicații 11/1/2020 12/1/2020 CLOSED/ÎNCHIS 2020 301 03 TELEKOM
    LOT 1 - 2020-301-04 Relocation of the Natural Gas/Oil Networks/Relocare rețele gaze naturale/petrol 11/1/2020 1/15/2021 CLOSED/ÎNCHIS 2020 301 04 GAS OIL
    LOT 1 - 2021-301-01 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz 4/18/2021 5/6/2021 CLOSED/ÎNCHIS 2021 301 01 TRANSGAZ
    LOT 1 - 2021-301-02 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz (Km 56+380) 8/18/2021 9/15/2021 CLOSED/ÎNCHIS 2021 301 02 TRANSGAZ
    LOT 1 - 2022-301-01 Relocation of the Natural Gas Networks/Relocare rețele gaze naturale – Transgaz (3 lines) 9/1/2022 9/26/2021 CLOSED/ÎNCHIS 2022 301 01 TRANSGAZ
    LOT 1 - 2024-301-06082024-01 Culvert over the ANIF canal in the continuation of the Popesti Leordeni ramp of the overpass on the DE over the motorway km 65+151/ Podet peste canalul ANIF in continuarea rampei Popesti Leordeni a Pasajului de pe DE peste Autostrada km 65+151 8/6/2024 8/16/2024 CLOSED/ ÎNCHIS 2024 301 06082024 01 INVITATION TO TENDER ANIF CULVERT
    LOT 1 - 2024-301-21052024-02 Signalization of A0/A2 Interchange / Semnalizarea nodului rutier de la intesectia Autostrazii A0 cu A2 5/21/2024 6/3/2024 CLOSED / ÎNCHIS 2024 301 21052024 02 INVITATION TO TENDER PORTALS
    LOT 1 - 2024-301-26052024-03 Installation of Sound absorbing Panels on A0, Interchange A0/A2, link G/ Instalare Panouri fotoabsorbante pe Autostrada A0, nod rutiere A0 / A2, bretea G 5/26/2024 6/10/2024 CLOSED / ÎNCHIS 2024 301 26052024 03 INVITATION TO TENDER SOUND ABSORBING PANELS
    LOT 1 - 2024-301-18112024-04 Additional works for Berceni / Lucrari suplimentare Berceni 11/18/2024 11/29/2024 CLOSED / ÎNCHIS 2024 301 18112024 04 INVITATION TO BERCENI ADDITIONAL WORKS
    2024-301-10102024-05 Additional works for A2 culvert at km 1+662 / Lucrări suplimentare pentru podet A2, km 1+662 10/10/2024 10/30/2024 CLOSED / ÎNCHIS 2024 301 10102024 05 INVITATION TO Additional Works For A2 Culvert At Km 1+662
    LOT 1 2024-301-01072024-06 A2 Storm Damage Repairs A2 Storm Damage Repairs / Reparații pentru Daune Cauzate de Furtună - A2 7/1/2024 7/10/2024 CLOSED / ÎNCHIS INVITATION TO Storm Damage Repairs
    LOT 1 - 2024-301-01102024-07 Berceni Overpass Lighting System / Sistemul de iluminat al pasajului Berceni 10/1/2024 10/15/2024 CLOSED / ÎNCHIS 2024 301 01102024 07 INVITATION TO Berceni Overpass Lightning System Rev
    LOT 1 - 2025-301-08012025-01 Box Culverts and Tubular Culverts 1/8/2025 1/15/2025 CLOSED / ÎNCHIS 2025 301 08012025 01 INVITATION TO BOX AND TUBULAR CULVERTS
    LOT 1 - 2025-301-08012025-08 Box and Pipe Culverts under A2 overpass 1/8/2025 1/15/2025 CLOSED / ÎNCHIS INVITATION TO Box And Pipe Culverts Under A2 Overpass
    LOT 1 - 2025-301-15032025-09 Berceni Road Access - extension of box culvert on ANIF channel execution 3/15/2025 4/15/2025 CLOSED / ÎNCHIS INVITATION TO Berceni Road Access Extension Of Box Culvert On ANIF Channel Execution
    LOT 1 - 2025-301-01122025-10 Berceni Utilities Relocation and Lighting on DJ401 overpass and access roads 12/1/2025 2/15/2026 OPEN / DESCHIS INVITATION TO Berceni Utilities Relocation And Lighting On DJ401 Overpass And Access Roads
    LOT 1 - 2025-301-15012026-11 Berceni area road, pedestrian access and bicycle lane 1/15/2026 2/15/2026 OPEN / DESCHIS INVITATION TO Berceni Area Road, Pedestrian Access And Bicycle Lane
  • Branch Offices

    • Romanya
    • Rusya
    • Alarko

      Strada Mircea Vulcănescu 49, București, Romanya

      • Telephone: +40 31 438 04 43
      • Fax: +40 31 438 04 43
      • Email: info@alsim.alarko.com.tr
      • Website: https://alsimalarko.com.tr
      Show on Map
    • Alarko

      Strada Mircea Vulcănescu 49, București, Romanya

      • Telephone: +40 31 438 04 43
      • Fax: +40 31 438 04 43
      • Email: info@alsim.alarko.com.tr
      • Website: https://alsimalarko.com.tr
      Show on Map

We take every step for a solid future.

  • Linkedin

Contact

  • Emirhan Cad. No:113 / C Barbaros Plaza Kat 4 PK: 34349 Dikilitaş Beşiktaş / İstanbul
  • (0212) 953 57 00 Pbx
  • 0212 259 59 25
  • info@alsimalarko.com.tr

Activity Fields and Projects

  • Refineries
  • Oil Gas and Pipelines
  • Transportation Projects
  • Housing and Building Projects
  • Power Plants
  • Industrial Plants
  • Water & Waste Water Treatment Plants
  • About Us
    • Alarko Contracting Group
    • History
    • Vision Mission and Values
    • Board of Directors
    • Organization Chart
    • GPDR
    • Awards
    • Promotional Catalog and Film
    • Certificates and Policies
  • Activity Fields and Projects
    • Refineries
    • Oil Gas and Pipelines
    • Transportation Projects
    • Housing and Building Projects
    • Power Plants
    • Industrial Plants
    • Water & Waste Water Treatment Plants
  • Career and Life
  • Sustainability
    • Sustainability
    • Our Sustainability Approach
    • Planet
      • Climate Change
      • Ecosystem Restoration
    • People and Culture
      • Talent Management
      • Organizational Development
      • Investments in Community
    • Digital Transformation and Innovation
      • Digital Transformation
      • Innovative Products and Innovation
  • News
  • Contact
  • Linkedin
  • Grievance Form
English
  • Information Society Services
  • Terms of Use
  • Sitemap
© 2026 Alsim Alarko Sanayi Tesisleri ve Tic. A.Ş.
Clockwork