• Batman Oil Refinery Power Boilers & Water Demineralization Plant

    Siirt/ Turkey

    The Project consisted of engineering, procurement, manufacturing of equipment and the execution of all civil, mechanical, electrical and instrumentation works of 2 power boilers, each with a capacity of 80 tons/hour steam at a pressure of 43 bars. Auxiliary systems such as deaerator, condensation tank, pressure reducing station, fuel heating and pumping system and water demineralization system with a capacity of 200 m3/hour were also included in the scope of the project.