Projects
-
Aliağa Oil Refinery Air Pre - Heater System
İzmir/Aliağa
The Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the air pre-heater system to save energy equivalent to 25.000 tons/year of fuel oil. The start- up and commissioning were also performed by Alarko Contracting Group.
-