Client | IGSAS (Istanbul Fertilizer Industry) |
Consultant | John – Zink, UK |
Capacity | 1.200.000 kcal/hour |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The Project consisted of the retubing of 2 superheaters, x-raying of all the welds, heat processing at 700°C as well as hydrostatic testing at a pressure of 162 bars. The above-mentioned superheaters were within a wasteheat boiler with a capacity of 210 tons/hour steam, at a pressure of 134 bars and a temperature of 505°C.