Client | Etibank |
Licensor | EVT, Germany |
Capacity | 3×45 tons/hour steam |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The turn-key Project consisted of the procurement and execution of all civil, mechanical, electrical and instrumentation works of the following units:
Three boilers with a capacity of 45 tons/hour steam each, at a pressure of 67 bars and a temperature of 485°C, a demineralization water system with a capacity of 120 m³/hour, a process water system with a capacity of 750 m³/hour, a coal preparation system, two cooling towers, two steam turbines with a total capacity of 10 MW.