Client | TUPRAS (Turkish Petroleum Refineries Co.) |
Capacity | 4×120 tons/hour steam 2×120 MW turbines |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The turn-key Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the following units:
4 boilers with a capacity of 120 tons/hour steam each, at a pressure of 100 bars and a temperature of 540°C , 2 turbo generators with a capacity of 12 MW each, water treatment unit with a capacity of 300 m³/hour.