Client | TUPRAS (Turkish Petroleum Refineries Co.) |
Licensor | Stein Industrie, France |
Capacity | 2×80 tons/hour steam |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The Project consisted of engineering, procurement, manufacturing of equipment and the execution of all civil, mechanical, electrical and instrumentation works of 2 power boilers, each with a capacity of 80 tons/hour steam at a pressure of 43 bars. Auxilary systems such as deaerator, condensation tank, pressure reducing station, fuel heating and pumping system and water demineralization system with a capacity of 200 m³/hour were also included in the scope of the project.