by admin | Oct 1, 2020 | NEW PROJECTS
The Southern Bucharest Ring Road Project, which we have undertaken in Romania, is 33 km long and consists of two sections. It is foreseen to be completed in a total of 36 months, including 12 months of design and 24 months of construction. The Ring Road project, which...
by admin | Oct 1, 2020 | NEW PROJECTS
The Almaty Ring Road will be implemented as a 20-years BTO (Build-Transfer-Operate) PPP (Public Private Partnership) where the concessionaire will be responsible for building, financing, operating, collecting tolls, and maintaining the road. The turn-key project...
by admin | Sep 19, 2019 | NEWS
KEÇİÖREN-ATATÜRK CULTURAL CENTER (AKM) METRO LINE (M4) The M4 line has 9 stations is about 9,25 km long .• At 3 stations (AKM, Meteoroloji, Dutluk) and along the line of the M4: Toll collection, CCTV, passenger information, telephone, wireless, central clock,...
by admin | Sep 19, 2019 | NEWS
Alsim Alarko made the best offer for Lot 1 and Lot 2 of the Bucharest Peripherial Road Design and Construction work consisting of a total of 3 Lots. Alsim Alarko was announced as the participant that gave the best offer for Lot 1 and Lot 2 in the tenders of the...
by admin | Sep 19, 2019 | NEWS
The İstanbul Metropolitan Municipality announced the opening of the first phase of the Kabataş – Mecidiyeköy – Mahmutbey Metro Line Project as the end of 2018. We are working at full speed to enable test operations to be completed by the end of 2018 and...