Client | Antalya Metropolitan Municipality |
Project Completion Date | (Under Construction in 2007) |
Capacity | 150.000 passengers/day |
Contractor | Alarko Contracting Group (Alsim) – CAF, Spain |
Description of the Project
The turn-key Project consists of the engineering, procurement and construction of 11,1 km long light railway system with 16 stations, 8 transformer substations, 1 depot-maintenance area and a depot connection line. The supply of 14 vehicles is also in the scope of the project. The main work items of the project are as follows:
Construction Works (Earth Works, Building Works etc.)
Track Works
Mechanical Works (HVAC, Fire Fighting, Plumbing etc.)
Electrical Works (Stations, Transformer substations etc.)
Electromechanical Works (Power Supply and Electrification System, Signalling System, Telecommunication and Control System, Supply and Installation of the Maintenance Equipments, Support and Inspection of the Operation and Maintenance)