Client | Adana Metropolitan Municipality |
Capacity | 660.000 passengers/day |
Contractor | Alarko Contracting Group (Alsim) – ABB Electric, Turkey – Adtranz (Bombardier Transportation) AB, Sweden |
Description of the Project
The turn-key Project consists of the engineering, procurement and construction of an approximately 13,5 km long light rail system with 13 stations, 6 station buildings, a depot area and maintenance facilities. The supply of 36 vehicles is also in the scope of the project. The system has been fitted with all modern mechanical, electrical, electronic, signalization, fare collection, building automation, intrusion detection systems.