Client | ALTEK A.S. (Power Plants Construction, Operation & Trading Company Inc.) |
Project Completion Date | 2005 |
Capacity | 74.500.000 kwh/year |
Contractor | Alarko Contracting Group (Alsim) |
Description of the ProjectThe turn-key Project consists of the procurement and execution of all civil, mechanical and electrical works and erection of all the equipment of the natural gas combined cycle power plant with a capacity of 74,5 MW.
The plant has two combustion turbines (GELM 2500+pk) with a total capacity of 60 MW, one condensing steam turbine generator with a capacity of 22 MW. The combustion turbines have been designed to burn natural gas as the primary fuel and diesel oil as back up fuel.
Generated electricity is transfered to National grid via 154 kV switchyard station and 51 kms 154 kV overhead transmission line which are also part of the project.