Client | Noell-KRC GmbH |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The Project consisted of the procurement and installation of the following units :
Four elevators for the dam, an air-conditioning, earthing and lighting systems, a telephone system, a fire protection system, a water cooling and transformer’s oil refining system.